
In keeping with QPE’s history of developing innovative product solutions for the underground hard rock mining industry come the QCS.
Manual Line Changeover in complex paste backfill systems has historically been a time consuming process requiring intensive plant and manpower. The Quattro Changeover Spool is a simple jig designed to streamline this process to allow underground personnel to focus on other critical activities.

Rated equivalent to the reticulation system it is servicing the QCS has one incoming line which can easily be switched between two outgoing by rotating the included S tube through 180°.
The system utilises Victaulic standardised couplings to further streamline the changeover process and align with existing reticulation. Additionally, no additional pipe bends are required.

AA

As paste reticulation systems become ever more complex, the incorporation of key instrumentation into the reticulation system forms a vital part of the system feedback loop and subsequent control.

Together with the Q-Claw, the Q-Brace race offers an integrated and certified system to hang and brace all underground infrastructure pipework that greatly reduces installation times and increases operational flexibility.

Together with the Q-Brace, the Q-Claw offers an integrated and certified system to hang and brace all underground infrastructure pipework that greatly reduces installation times and increases operational flexibility.

In response to the ever-increasing statutory requirements associated with Integrated Tool Carriers (ITC) coupled to work platforms for working at heights in the underground environment, QPE have developed and registered conforming designs with Worksafe Australia.

Quattro have developed and implemented a mechanised solution to installing and removing underground mine ventilation fans.